#EUSEW2024 | Don't miss ENZA webinar on May 14th. Highlights:
✅Benefits of #sectorintegration for a cost-efficient #energytransition ✅Accelerate renewables integration into our #energy system ✅Opportunities for EU industries to mitigate CO2 emissions
👉http://bit.ly/3UCa84J

What are the benefits of Underground #HydrogenStorage (UHS) for society?
How can we unlock its full potential?

Our expert Carole Le Henaff answered those questions at @FlameConference:
✅#Decarbonisation
✅#Energy resilience
✅The solutions: https://bit.ly/4dc1eSH

#GETCongress proudly welcomes @achovskiboyana, Secretary General at @GIEBrussels, as a speaker for the Strategic Conference.

Register as a delegate today: https://bit.ly/487yW9l
View Strategic Conference Agenda: https://bit.ly/3U1xj80

#GETCongress #EnergyTransition

📽️(Re)watch our event on underground #hydrogen storage (#UHS) needs in the EU.

👉There is an #urgent need for targeted policy intervention to meet Europe's UHS requirements.

Dive into the insights revealed at our recent workshop in Brussels: https://bit.ly/43ajyqu

Load More...
 

The AquaDuctus project

By GASCADE & Fluxys

AquaDuctus will be a GW-scale offshore hydrogen pipeline – the first of its kind in European waters. The project is thus pursuing the goal of connecting large amounts of renewable hydrogen obtained offshore with the mainland and injecting into the emerging onshore infrastructure. In this way, demand centres, e.g. industrial chemical sites, hydrogen storage facilities etc. in Germany and other European member states can be reached.In a first phase, AquaDuctus connects a 15 MW hydrogen production plant (AquaPrimus II) off the coast of Helgoland with the consumers on the island. These projects were selected by the German Federal Ministry of Economics for funding as part of the hydrogen IPCEI process.

The next step is to connect the SEN-1 wind farm site, located 150 km north-west of Helgoland with a generation capacity of up to 1 GW for the production of green hydrogen, to the German mainland and the further onshore hydrogen infrastructure. Furthermore, it is planned to design the pipeline in such a way that a connection can be established to more distant future hydrogen wind farm sites in the exclusive economic zone of the North Sea in order to transport up to 10 GW of hydrogen production capacity to the German mainland (German Offshore H2 Backbone).

In addition, the pipeline also enables connections to other offshore hydrogen infrastructures of bordering European North Sea countries (European Offshore H2 Backbone). The pipeline, when fully utilized, will replace five high-voltage direct current (HVDC) cables that would otherwise need to be built and is therefore by far the most cost- and time-effective option for transporting large amounts of energy over long distances and has the lowest environmental impact.


Oliver Reimuth

Hydrogen & Systainability

Tel.: +49 561 934-1385
E-Mail: oliver.reimuth@gascade.de
GASCADE Gastransport GmbH / Kölnische Straße 108-112 / 34119 Kassel, Germany